Drop in to the Glen Dimplex Studio during the Shoreditch Design Triangle

Date:
14th - 22nd
September 2019
Time:
10am - 6pm everyday
Stays open until 9pm on Tuesday 17th
Location:
23 Charlotte road,
Shoreditch

We are delighted to be taking part in the Shoreditch Design Triangle from the 14th – 22nd September 2019.

We are opening the doors of the Glen Dimplex Flame Studio to architects, interior designers, interior manufacturers and all visitors to Shoreditch Triangle Design, from 10am till 6pm each day. 

On Tuesday 17th our doors will stay open until 9pm, and visitors from 5pm will be welcomed with a delicious selection of drinks and canapés.

The Flame Studio provides a unique showcase of our flame technologies, as well as our many innovations in heating, fires and our wider portfolio of brands. Drop in to see us and explore the design possibilities offered by our electric flame products, as well as the rest of our dynamic portfolio.


What you can expect when integrating electric flames to your project:

Flexibility and versatility

Designed to meet a host of requirements, with bespoke options available, our range of flame effects bring a new level of agility to design projects, helping you add value and desirability to any space

low maintenance

Delivering an aesthetically pleasing yet cost-effective design is now easier than ever before, with electric flame combining style and cost savings with minimal maintenance requirements

Ease of use and installation

With no requirement for a chimney or working flue, our products can be specified at the design stage, or installed further along with project timelines, into existing spaces or newly developed niches

A technology to suit any design and space

Our experience and focus on R&D ensures you have a range of technologies to choose from that meet your design, functionality and legislative needs

Book your Electric Flame CPD

We will also be offering our electric flame technologies CPD course, Electric Flame; Ignite your Imagination, at various times and dates through the week. Attendees to this RIBA approved CPD course will gain:

 
An overview of changing legislation affecting flame installations in buildings
 
An understanding of both the internal and external environmental impact of flame installations
 
A demonstration of the flexibility electric flame applications allow and how they work
 
An understanding of the role of flame in the development of NZEB properties
 
An update in the wider developments of all electric heating technologies and applications
 
Access to simplified installation techniques suitable for a range of design briefs

Unable to attend these dates?